Cables Replaced on Slips

KC and crew (Elton, Jerry, Tom & Lonnie) replaced the anchor cables on the slips with new stainless steel cable this past Thursday, October 20.  The crew also worked on the swim dock and Loading dock to have them ready for next year.  Good work team and thanks KC.20161020_160727_resized 20161020_160737_resized

Previous
Previous

December Snow and Wind 2016

Next
Next

October Spinkler System North of Clubhouse Update